Areas of expertise

Transmission Lines


Furnas Power Stations

  • LT Foz de Iguaçu-Ivaiporã-750 kV-122 km
  • LT Gurupi-Miracema-500 kV-255 km
  • LT Campinas-Cachoeira Paulista-500 kV-134 km

CESP-Energy Company de São Paulo

  • LT Agua Vermelha-Ribeirão Preto-460 kV-107 km
  • LT Agua Vermelha-Araraquara-460 kV-80 km
  • LT Bauru-Assis-460 kV-137 km

CHESF-São Francisco Hydroelectric Company

  • LT Maceió-Rio Largo-230kV-11,5 km

CELG- Power Stations of Goiás

  • LT Britania-Aranã-69 kV-41 km
  • LT Fazenda Canadá-Britania-69 kV-36 km

Substations


CESP- Energy Company de São Paulo

  • Civil Works and Electromechanical Assembly of SE Sumaré 460 kV
  • Expansion of the SE Embu Guaçu 460 kV
  • Civil Works and Electromechanical Assembly of SE Mogi das Cruzes 460 kV-5ª Enlargement

CHESF-São Francisco Hydroelectric Company

  • Civil Works and Electromechanical Assembly of SE Penedo-230 kV

ELETROPAULO-Electricity of São Paulo

  • Civil Works and Electromechanical Assembly of SE Cesário Lange-138 kV
  • Electromechanical Assembly of the SE Penha-138 kV
  • Electromechanical Assembly of the SE Vila Ema-138 kV
  • Electromechanical Assembly of the SE Canã-138 kV, insulated with SF6 gas

Substations in the Transport Area

CBTU-Brazilian Company of Urban Trains

  • Executive Project, Supply and Electromechanical Assembly of the substations of Francisco Morato, Pari, Vila Clarice and Franco da Rocha of CPTM-SP

SUPERVIA-RJ

  • Operation and Maintenance of several substations

Aerial Networks


CBTU-Brazilian Company of Urban Trains

  • Executive Project, training, supply, assembly, commissioning of the Belo Horizonte metropolitan train network system, in the sections, São Gabriel Station-Eldorado Station, São Gabriel-Via Norte stretch and the Central Station-Minas Shopping Station section, with 68 km of dual carriageway
  • Executive Project, training, supply, assembly and commissioning of the Recife Metropolitan Train Aerial Network system in the TIP-TIMBI stretch with 5 km of dual carriageway
  • Supply and Electromechanical Assembly of the aerial network system for the suburban train between Gramacho and Campos Elicios-6.5 km-Rio de Janeiro

CPTM-Paulista Company of Metropolitan Trains

  • Design and Construction of 94 km of airway of Line A

International

Subway of Caracas (Venezuela)


  • Construction Mounting and supply of permanent way of part of Line 2 of the meter, being 7 km of track over ballast and 3.5 km of track over concrete. (together with SPIE-Enertrans de France)